Sweaney recently used the FireTrak System on our Porterville Dialysis Center project. This head of wall track system is used to allow deflection for the full height studs while allowing 2 layers of drywall to be installed to maintain the fire-rating of the wall assembly. The side leg can be ordered for single & double layer applications.
Sweaney contracted with Younglove Construction on this new citrus processing plant for Paramount Farms in Delano, Ca. This project included a 500,000 sq ft industrial warehouse, a 2 story office complex, truckers lounge, catwalk observation deck, employee break areas & restrooms. Sweaney provided the metal studs & drywall, plus a water drainage EIFS system on the exterior metal stud walls. Sweaney also had the opportunity to apply a weather resistant liquid barrier from Parex Corp.
This is the new 37,000 square foot Houchin Blood Bank in Bakersfield, Ca. Sweaney was subcontracted by Wallace & Smith to provide the metal stud framing, drywall & EIFS finish for this state of the art medical facility.




Sweaney is back at Paramount Citrus plant in Delano, Ca. to help construct a 20,000 square feet 2 story addition to the 41,000 sf office building. We built in 2012 we are longstanding partners with Younglove Construction Group & will be providing the metal studs, drywall & EIFS finish at the exterior as well.







Sweaney was subcontracted by Wattenbarger Wells general contractors to provide the interior metal stud framing & drywall for the new 47,000 square foot San Dimas Medical Center. Located in the parking lot of Mercy Southwest Hospital in Bakersfield, Ca., this facility will offer a variety of women’s medical services.
Sweaney is about to begin work on a 20 bed addition for Health South rehabilitation hospital. We are looking forward to participating in a project that improves the medical care in our local community. One of our goals for 2014 was to work on a OSHPOD hospital project to continue to expand our experience & improve our medical projects portfolio. Sweaney will be performing the metal stud framing, drywall, painting &
Sweaney is onsite at The shops at Riverwalk project. We are subcontracting with S C Anderson to provide the metal studs & drywall for this 25 acre development that will feature a Nordstrom Rack outlet store, a Sprouts grocery outlet , a T J Maxx store & a Bevmo location.
Sweaney Inc. is a long term construction partner with Nestle/Dreyers to maintain & expand their facility in Bakersfield, Ca. We work directly with Nestle/Dreyers to provide metal stud framing, drywall & painting services. We have renovated several key areas of their facility:
- T A G area renovation
- R & D renovation
- Board room renovation
- Mail room renovation
- Think tank renovation
This relationship requires us to be very flexible with scheduling,
Sweaney was excited to be subcontracted by Wallace & Smith to work with Aera Energy Corp. to update & modernize their 60,000 sq ft facility as needed. Work included for this project is metal stud framing, drywall & painting.
In the past year we have already completed:
- 2nd floor A wing renovation
- 3rd floor B wing renovation
- 1st thru 3rd floor Atrium renovation
This is an ongoing renovation project that sometimes requires unconventional methods to meet aggressive timeframes.
We have a lot of experience with steel buildings: Constructing an office space inside a steel building system always requires some planning & innovation. Your floor plan has to match the space available from the building span, while all your subtrades have to fit all their stuff(conduits,pipes,ductwork) into walls built inside of steel beams & girts. Not to mention your final product is not supposed to look anything like a metal building on the inside!