2 Story Office Expansions

Sweaney is back at Paramount Citrus plant in Delano, Ca. to help construct a 20,000 square feet 2 story addition to the 41,000 sf office building. We built in 2012 we are longstanding partners with Younglove Construction Group & will be providing the metal studs, drywall & EIFS finish at the exterior as well.

4/15/2014-First day on site
4/15/2014-First day on site

IMG_1599-1024x764

 4/25/2014-Making great progress with the exterior framing
4/25/2014-Making great progress with the exterior framing
4/29/2014-Stairwell framing completed
4/29/2014-Stairwell framing completed

IMG_1770-1024x764

IMG_1680-1024x764

4/27/2014-Began top out drywall before overhead ductwork can be installed
4/27/2014-Began top out drywall before overhead ductwork can be installed
We installed a 6″ coreshaft system at the elevator shaft
We installed a 6″ coreshaft system at the elevator shaft
We installed tile backer board under the ceramic tile in the restrooms
We installed tile backer board under the ceramic tile in the restrooms

IMG_1908-1024x764

We are appling exterior gyp sheathing as the substrate to apply the EIFS
We are appling exterior gyp sheathing as the substrate to apply the EIFS